طرح توجیهی واحد متانول (پروژه طرح و اقتصاد)
Explanatory Plan of Methanol Unit (Design and Economy Project)
آبان ۱۸, ۱۴۰۳
Simulation of Sulfuric Acid Unit by Proximity Method with Aspen Hysys
آبان ۱۸, ۱۴۰۳
Simulation of Sulfuric Acid Unit by Proximity Method with Aspen Hysys
آبان ۱۸, ۱۴۰۳
طرح توجیهی واحد متانول (پروژه طرح و اقتصاد)
Explanatory Plan of Methanol Unit (Design and Economy Project)
آبان ۱۸, ۱۴۰۳
all

Simulating The Process of Transferring Oil (50k Barrels Per Day)

Description

Aspen Hysys simulation of the general process of transferring oil to the amount of 50k barrels per day

After the end of the drilling and extraction operations and reaching the oil reservoirs, the phase of exploitation of the well and oil extraction begins. At this stage, drilling equipment and drilling pipes are removed from the well. Then, a series of new pipes for oil extraction are installed inside the well. At this stage, if the pressure of the oil tank is high, the well will erupt naturally and the oil will rise. whose pressure should be controlled by pressure relief valves. But if the pressure of the tank itself is not enough for the oil to reach the surface of the earth, a series of methods are used to extract the oil.

Process of Transferring Oil

In this project, the overall process of oil transportation in the amount of 50k barrels per day .(Darkhoin area – Kushak and Hosseinieh fields) is simulated with the help of Aspen Hysys software. The simulation was done on the data collected from the oil fields. Calculating the pressure drop of transmission lines has been the main goal of this project. And complete explanations will be sent to you in the form of video (video) along with the project.

oil transportation in the amount of 50k barrels per day (Darkhoin area - Kushak and Hosseinieh fields)

Aspen data bank has been used for the oil properties of the mentioned fields.


194 $

Call Now Button