Description
Aspen Hysys simulation of the general process of transferring oil to the amount of 50k barrels per day
After the end of the drilling and extraction operations and reaching the oil reservoirs, the phase of exploitation of the well and oil extraction begins. At this stage, drilling equipment and drilling pipes are removed from the well. Then, a series of new pipes for oil extraction are installed inside the well. At this stage, if the pressure of the oil tank is high, the well will erupt naturally and the oil will rise. whose pressure should be controlled by pressure relief valves. But if the pressure of the tank itself is not enough for the oil to reach the surface of the earth, a series of methods are used to extract the oil.
In this project, the overall process of oil transportation in the amount of 50k barrels per day .(Darkhoin area – Kushak and Hosseinieh fields) is simulated with the help of Aspen Hysys software. The simulation was done on the data collected from the oil fields. Calculating the pressure drop of transmission lines has been the main goal of this project. And complete explanations will be sent to you in the form of video (video) along with the project.
Aspen data bank has been used for the oil properties of the mentioned fields.