شبیه سازی فرآیند آب‌زدایی هتروژنی اتانول با استفاده از نرم‌افزار Aspen Plus
Simulation And Optimization of Ethanol Separation from Water in Aspen Plus
مهر ۲۱, ۱۴۰۳
شبیه سازی کامل واحد متانول پتروشیمی مرجان در اسپن پلاس
Full Simulation of Marjan Pet. Co. Methanol Unit With Aspen Plus
مهر ۲۱, ۱۴۰۳
شبیه سازی کامل واحد متانول پتروشیمی مرجان در اسپن پلاس
Full Simulation of Marjan Pet. Co. Methanol Unit With Aspen Plus
مهر ۲۱, ۱۴۰۳
شبیه سازی فرآیند آب‌زدایی هتروژنی اتانول با استفاده از نرم‌افزار Aspen Plus
Simulation And Optimization of Ethanol Separation from Water in Aspen Plus
مهر ۲۱, ۱۴۰۳
all

Simulation of Aspen Hysys LPG Unit of “Fajr Jam” Refinery

Description

This unit is designed to produce LPG, butane, and propane from gases exiting the top of the gas condensate stabilization column, which were previously flared.

The unit consists of two sections ، Process  and Storage :

process and storage

The process section includes three subsections

liquefaction, separation, and LPG purification. The liquefaction section comprises a refrigeration unit for liquefying the incoming gases. The separation section consists of three distillation columns. For separating LPG from components lighter than C2- and heavier than C5+. The purification unit removes sulfur components using a molecular sieve process. The unit has a daily capacity of 200 tons of LPG.

LPG Unit of "Fajr Jam" Refinery

There is a video here that explains everything well. It should be noted that this industrial project has been completed with a very low error percentage (less than 5%). A part of the refinery map is shown below:

LPG Unit of "Fajr Jam" Refinery

After purchasing this project, the simulation file, industrial maps, and training video will be sent to you. In addition, the complete description file of the operation instructions of the unit and the notes contained in the refinery documents for the “Kangan” natural gas project will also be sent to you on the previous files.

LPG Unit of "Fajr Jam" Refinery


Price:: 669 $

Call Now Button